Why would an electrician install a 10 mm twin and earth circuit protected by a B32 MCB for a 8.5 kW shower?
Why would an electrician install a 10 mm twin and earth circuit protected by a B32 MCB for a 8.5 kW shower?
It also becomes an interesting sounding board of what seems to be deemed acceptable and why when you cannot understand how some people think things through.
I knew what to expect, so I was not actually surprised when I got it, even though I think I should be ?
Presumably applying the same logic it is okay to install a supply to Electric Vehicle Supply Equipment and hook up an electric car charging point with an ill fitting, under rated MCB that was not designed to fit the consumer unit?
It also becomes an interesting sounding board of what seems to be deemed acceptable and why when you cannot understand how some people think things through.
I knew what to expect, so I was not actually surprised when I got it, even though I think I should be ?
Presumably applying the same logic it is okay to install a supply to Electric Vehicle Supply Equipment and hook up an electric car charging point with an ill fitting, under rated MCB that was not designed to fit the consumer unit?