There is an article in PE and I have just received it via email.
I am disappointed that the article seems to suggest that it contains all you need to know yet no mention is made of earthing systems
I might be talking out of my hat here, but why not combine both systems? Why not export PME via the swa and 3rd core, tie both together at both ends, the tie both to a rod at the destination end too? Belt & braces?
Otherwise, we need to be looking at siting the electrical apparatus, pump, water heater etc remotely from the tub and further isolating heated pumped water through the use of distilled water and the requisite length of plastic pipework.
I might be talking out of my hat here, but why not combine both systems? Why not export PME via the swa and 3rd core, tie both together at both ends, the tie both to a rod at the destination end too? Belt & braces?
Otherwise, we need to be looking at siting the electrical apparatus, pump, water heater etc remotely from the tub and further isolating heated pumped water through the use of distilled water and the requisite length of plastic pipework.