This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

The dreaded bonding again

Sorry for this but my boiler recently had her annual service all was well except they said I don't have any bonding in place except I think I do the gas main is bonded in the meter cupboard and the radiators and hot and cold water feeds are all bonded in the bathroom upstairs. All pipework is copper throughout the plumbing never been altered in 40 years except for a new boiler oh and removal of the water tanks. So can I be confident the bonding upstairs is good enough? 

Parents
  • The pipes are all metal no plastic anywhere. If it helps the water bonds upstairs are run straight back to the MET the ststem is tns the main earth clamped to the lead sheath of the  DNOs cable

Reply
  • The pipes are all metal no plastic anywhere. If it helps the water bonds upstairs are run straight back to the MET the ststem is tns the main earth clamped to the lead sheath of the  DNOs cable

Children
No Data