Some bedtime reading regarding the new approved doc S www.gov.uk/.../approved-documents
Some bedtime reading regarding the new approved doc S www.gov.uk/.../approved-documents
Thank you Jon. Interesting reading! Introducing cost caps is a minefield. Where we are, BC fees are based on the project cost, needless to say, there are perennial arguments. I can see the bean counters and QS guys doing better than the sparks!
where did the £3600 and 7% come from, I wonder?
Even if it exceeds £3600/7%, I read it as provision for cable routes need to be provided. What does that mean? A spare way in the DB, and room to mount an adaptable box, so that a SWA cable can be put in later? Or, a cable already in place? I'd say the former.
As said above, Large Building Companies will be getting their Accountants onto it , so that they do not have to provide an EV point. This, to me, shows it is poor Legislation. IMO, It should be mandatory to provide it, and also PV panels, why aren't they mandatory on new builds now?
Even if it exceeds £3600/7%, I read it as provision for cable routes need to be provided. What does that mean? A spare way in the DB, and room to mount an adaptable box, so that a SWA cable can be put in later? Or, a cable already in place? I'd say the former.
As said above, Large Building Companies will be getting their Accountants onto it , so that they do not have to provide an EV point. This, to me, shows it is poor Legislation. IMO, It should be mandatory to provide it, and also PV panels, why aren't they mandatory on new builds now?