Is this an example of over tightening?
Also some E.V. charger point testing at the end. Very interesting.
Z.
Is this an example of over tightening?
Also some E.V. charger point testing at the end. Very interesting.
Z.
Probably just the DNO fuse seal actually and then cut the existing meter tails to reach the Henleys with a bit of a loop. No need to open the meter :-).
Only the main fuse seal is missing at the end - in shot at 9.33 gone at 10.56.
No sign of a temporary DNO approved paper seal. Ah well.
Mike.
Yes Colin and are not from a meter installer, another give-away. Can anyone see why?
We're about to take you to the IET registration website. Don't worry though, you'll be sent straight back to the community after completing the registration.
Continue to the IET registration site