This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

Suburban filling station

This is a new site in a densely populated area. TT 400A TPN DNO supply. The site is pinned to earth by electrodes at various points, several along the wooden perimeter fence you see to the left.

The DNO Tx is immediately behind the metal fence. The whole surrounding area is PME. DNO would obviously not provide a PME terminal but given the proximity of other buildings, is it prudent to consider the site as TT?

Parents
  • Excuse my writing with my little finger.

    Is that the layout? Is the metal fence bonded to the Tx earth as well?

Reply
  • Excuse my writing with my little finger.

    Is that the layout? Is the metal fence bonded to the Tx earth as well?

Children
No Data