I am having the incomer my property modified and at the same time I am having an additional distribution installed in an extension. The current distribution board remains unchanged and both boards will share the incomer. If the supply to the existing distribution board is changed over to the modified incomer will a full test of the existing domestic distribution system be required? There are two options a) connect the existing distribution board to the new incomer using existing cabling so not changing any wiring in the existing board or connect a new cable instead. The existing board is tested and documented and is due for retest 2025.