Evening all,
So, this is causing me some head scratching. Why oh why did this make it through the DPC?
As soon as an escape route is required to be of fire rated construction, we can't use it for main containment routes. Or am I missing something?
Evening all,
So, this is causing me some head scratching. Why oh why did this make it through the DPC?
As soon as an escape route is required to be of fire rated construction, we can't use it for main containment routes. Or am I missing something?
The main concern as stated in Appendix. 13 is that of allowing a safe escape from a building in case of fire where escapees travel a longer distance than normal. This may occur in large and more complex buildings. The removal of flammable materials is a wise one. Flammable materials may cause toxic smoke and also restrict visibility.
Z.
The main concern as stated in Appendix. 13 is that of allowing a safe escape from a building in case of fire where escapees travel a longer distance than normal. This may occur in large and more complex buildings. The removal of flammable materials is a wise one. Flammable materials may cause toxic smoke and also restrict visibility.