Evening all,
So, this is causing me some head scratching. Why oh why did this make it through the DPC?
As soon as an escape route is required to be of fire rated construction, we can't use it for main containment routes. Or am I missing something?
Evening all,
So, this is causing me some head scratching. Why oh why did this make it through the DPC?
As soon as an escape route is required to be of fire rated construction, we can't use it for main containment routes. Or am I missing something?
Its the escape route designated in the fire escape plan that flowed from the Fire Risk Assessment.
Its the escape route designated in the fire escape plan that flowed from the Fire Risk Assessment.