Changing MCBs to RCBOs is it notifiable under part P

Now retired I am no longer a member of a competent persons scream, I was full scope member of NICEIC, 2391 qualified etc;   I can still hold a screw driver and press the buttons on my MFT when I can remember where I put them down.  

In the lovely house we built to retire in the 21 way consumer unit is full,  having had a lot of twinkly LEDs wiped out in the recent thunder storm , I think urge protection would be a good idea.

In order to free up the slots occupied by two RCDs and have space for the urge protector by simply changing the MCBs to RCBOs.  Is this notifiable under part P.

 I have done some other recent electrical changes and our local building control who are absolutely super relieved me of around £100 for the pleasure of fitting some 16A industrial sockets in my workshop because the work was indeed notifiable.    I would prefer not to have to pay another £100. 

  

Parents
  • Fitting of a new CU is notifiable. Installation of a new circuit is notifiable. I don't think that changing bits in a CU is notifiable, nor is the addition of sockets of whatever variety.

Reply
  • Fitting of a new CU is notifiable. Installation of a new circuit is notifiable. I don't think that changing bits in a CU is notifiable, nor is the addition of sockets of whatever variety.

Children
No Data