Hi, a standalone 630A MCCB within an enclosure in a locked intake room adjacent the CT metering panel has been proposed as the main switch. The main LV panel is 20m away.
Does it specifically need to be a 4-pole MCCB or is 3-pole sufficient please?
An earthing arrangement (not sure but either PME (TN-C-S) or SNE (TN-S)) is being provided by utility company.
Solar PV is present as part of the elec installation and set up to export in case that makes a difference.
Thanks