When to notify dno of car charger in domestic

Very quiet here lately .

Anyway, under what circumstances should you notify -or not as the case maybe -the dno of a domestic charger .

I’ve always gone on the uk power network low carbon portal prior to works commencing and entered the answers and details for any domestic charger and a waited the response usually in less than 24hrs , but I seem to be competing with others who don’t .

any ideas ? Ty .

Parents
  • Since the grants were reviewed there are far more contractors able to install and far less scrutiny on the quality of the job. It is likely that most contractors not previously on the OZEV scheme would be unaware of the COP and the DNO notification requirements. From what I can see, installing an EV point in domestic premises is looked upon in the same way as installing any other circuit. No concern about open PEN, RCD type, main protective bonding or maximum demand and certainly no worry about permission or notification.

Reply
  • Since the grants were reviewed there are far more contractors able to install and far less scrutiny on the quality of the job. It is likely that most contractors not previously on the OZEV scheme would be unaware of the COP and the DNO notification requirements. From what I can see, installing an EV point in domestic premises is looked upon in the same way as installing any other circuit. No concern about open PEN, RCD type, main protective bonding or maximum demand and certainly no worry about permission or notification.

Children
No Data