Anyway, under what circumstances should you notify -or not as the case maybe -the dno of a domestic charger .

I’ve always gone on the uk power network low carbon portal prior to works commencing and entered the answers and details for any domestic charger and a waited the response usually in less than 24hrs , but I seem to be competing with others who don’t .

any ideas ? Ty .

Parents
  • I work for a DNO accepting chargers onto our network. All chargers need to come to us for either notification of installation or application for installation depending on whether it meets the criteria set out by the energy network association. 

    Use the ENA website to download an application form and if you can tick all the relevant tick boxes for the charger then you can apply for notification of installation. Any box not able to be ticked comes to us for assessment.

    Any single phase amendments needed at the property is now FOC at our DNO. Three phase dependent on network requirements.

Reply
  • I work for a DNO accepting chargers onto our network. All chargers need to come to us for either notification of installation or application for installation depending on whether it meets the criteria set out by the energy network association. 

    Use the ENA website to download an application form and if you can tick all the relevant tick boxes for the charger then you can apply for notification of installation. Any box not able to be ticked comes to us for assessment.

    Any single phase amendments needed at the property is now FOC at our DNO. Three phase dependent on network requirements.

Children
  • CBSharpe advises that his DNO does not charge for single phase amendment needed at a property.

    I am assuming that by "amendment" this includes upgrade of an existing cut-out and fuse?

    Has anyone a list of DNOs who similarly do not charge?

  • By amendment I mean whatever upgrades are required to meet the maximum demand of the property after diversity has been applied. Some legacy cut outs and cables don’t facilitate 80A so we may need to do a cable overlay or cut out change or de-looping of the property once we have assessed the size of the loop and whether there are any low carbon technologies already on it. 

    Looped supplies, the last I heard, said that you could have 1 LCT in a loop of 4, 2 in a loop of 3 and for some reason 1 in a loop of 2. Anything bigger than 4 and we would de-loop or any more than 1 in the scenarios mentioned we would also de-loop. 

    I have since left that post to take up an engineering role in the same business but at the time of leaving, and I’m pretty sure it’s still company policy, but we no longer offer 100A on a single phase supply. The maximum is 80A but 80A can take loads upto 100A for 4 hours within a 24 hour cycle for those who have small spikes for chargers or heat pumps. 

  • The maximum is 80A but 80A can take loads upto 100A for 4 hours within a 24 hour cycle for those who have small spikes for chargers or heat pumps. 

    Just to be clear, that may be the DNO perspective, but it's not necessarily the same perspective in BS 7671, and if the DNO's cutout is used for overcurrent protection of any part of the consumer's equipment (e.g. tails), effectively this could limit the supply maximum demand (or more pertinently for what is becoming a common solution, import limitation, or load curtailment, setting) to 80 A.