Temp Site Supply

Hello,

I am hoping for some help/guidance from the community 

I am currently applying for a temp site supply for the construction of 6 bungalows....

I am after some guidance on what size supply i should apply for....

Thanks 

Parents
  • Hi ARL02. My own experience of this is that the electrical supply for the temporary cabins varied depending on the project and the existing infrastructure. For a renovation project of an existing building, we provided three separate single-phase 32A supplies for the cabin, the office, and the toilet block. For a hospital extension project, we provided one three-phase 200A supply for all the cabins and shower blocks. The specification of the electrical supply was usually determined by the principle contractor who was responsible for the CDM.

Reply
  • Hi ARL02. My own experience of this is that the electrical supply for the temporary cabins varied depending on the project and the existing infrastructure. For a renovation project of an existing building, we provided three separate single-phase 32A supplies for the cabin, the office, and the toilet block. For a hospital extension project, we provided one three-phase 200A supply for all the cabins and shower blocks. The specification of the electrical supply was usually determined by the principle contractor who was responsible for the CDM.

Children
No Data