EICR's for Campsites.

What is the recommended maximum period between inpections  and testing for shower blocks, laundry rooms and communal washing facilities on campsite? The electric hook ups and the distribution wiring to them is yearly but there is no mention of other parts of the installation. The scope in Section 708 of BS7671 does not cover these buildings. Are these buildings defined as commercial (5 years) or due to the fact they are on a campsite part of a leisure complex (3 years)?

Parents Reply
  • Thanks Sparkingchip, I never looked up the local authority conditions, which of course Duty Holder needs to comply with. Interesting the license conditions refer to BS7671: 2001 and PIR's. 

    I would hope that the admin side does then submit copies of reports within that timescale, but advice of the competant inspector and age of installation and condition and any non compliance/observations are classed appropriately and next recommended interval to inspection is no greater than three years, but could be less depending on what the inspection reveals.

    But that document certainly clarifies things as far as local authority goes,

    Cheers GTB