This installation has received a C3.
I am tempted to do nothing as an electrician has quoted about £600 to replace the lot with a board full of RCBOs.
Is there a simple way of improving the fire rating?
This installation has received a C3.
I am tempted to do nothing as an electrician has quoted about £600 to replace the lot with a board full of RCBOs.
Is there a simple way of improving the fire rating?
Was a detailed reason given for getting a C3? At first glance, this looks fine.
Was a detailed reason given for getting a C3? At first glance, this looks fine.