Import and Export meter overloading - is it possible?

I had a large electricity supplier install solar PV and battery system and the import meter melted followed by the export meter.

They are stating that it is my issue and not there's as I have overloaded my consumer unit.

The import meter was rated to 100A

The export meter was rated to 100A

My incomer is protected by an 80A fuse

My export meter is on a supply protected by a 50A MCB

They are saying it is not their issue and I will have to go through the Ombudsman if I don't agree with their report.

How do I deal with a large company that refuses to take responsibility for faulty workmanship.

   

Parents
  • Additional information - Fully electric house, 5.5kWp PV system through a 4.5kW invertor with 30kW battery storage. 1 x EV point protected by 32A MCB. Max system draw (midwinter) as monitored via MyEnergy is 15.8kW with EV charging

Reply
  • Additional information - Fully electric house, 5.5kWp PV system through a 4.5kW invertor with 30kW battery storage. 1 x EV point protected by 32A MCB. Max system draw (midwinter) as monitored via MyEnergy is 15.8kW with EV charging