we use the 80% to compare against our measured ZS to compensate for the temperature of the wiring being less than 70 C .
we apply this to the whole maximum ZS ,should it not be only applied to the R1+R2 ,as the ZE part may be at a different temperature and possibly wont be loaded up as much.
Or is it just safer and good engineering to apply the 80% to all?