Goodly morrow
Just for discussion sakes: presume a domestic property has a DNO provided earth (eg. TN-C-S) and has a 'separate' TT earthed outdoor installation.
What are the switching solution options and scenario dangers (if any), for when needed, transferring over the supply to a [temporary] generator and switching out the TN--C-S for the TT electrode (for generator earth reference) ?
Thank you
Habs