Did a zs test today on a ring main newly installed, had done end to end & ins res & rcd tripped when i pressed meter to go. Tested on another socket circuit which was existing circuit in the property & it did the same switched off all mcb's apart from mine & it still tripped. Plugged hoover in to new circuit to see if it would trip & it was fine. Never had it before. If i was doing a periodic how can i test zs if it does this & why would it do that.