Diverted neutral currents EICR

  1. If we’re are experience NCD when preforming an EICR on a property does this need to be noted on the observations, if so what code should this be given. I’m aware that this needs to be reported to the DNO and should be investigated and rectified. 
Parents
  • Another consideration is the direction of flow. Is it my neutral which is being diverted down the gas pipe to next door, or theirs which is going in the opposite direction?

Reply
  • Another consideration is the direction of flow. Is it my neutral which is being diverted down the gas pipe to next door, or theirs which is going in the opposite direction?

Children