Hello everyone,

I'm wrestling with grouping factors for cables between a substation and LV feeder pillar. I'm limited with the number of parallel feeds as the sub will only take 4 conductors per phase. I have my cable depth to 0.5m and soil resistivity to 1.2K.m/W. The software I'm using only gives an option of up to 600mm distance between trefoils as does ERA 69-30 so my question is how do I show the correct derating factor above 600mm is there any guidance? I was thinking that if I was to specify a 0.9m gap I allow an extra 0.12% as the difference between 0.3m & 0.6m is 0.12. The cables are direct buried and it's AWA. I can only get the cables to be satisfactory if I get the Cg to 0.95 but I want to be able to justify this choice but cannot find anything to assist me with anything over 600mm spacing.

Parents
  • Not my area really, but just to get the discussion going...

    I wonder if there are reasons for larger gaps not being usual ... perhaps with the trefoils in parallel there isn't perfect balancing within each trefoil, so there might be some induction between groups (small compared with the load currents, certainly, but maybe sill significant?) so maybe wider spacing might have a detrimental effect on reactance?

       - Andy.

Reply
  • Not my area really, but just to get the discussion going...

    I wonder if there are reasons for larger gaps not being usual ... perhaps with the trefoils in parallel there isn't perfect balancing within each trefoil, so there might be some induction between groups (small compared with the load currents, certainly, but maybe sill significant?) so maybe wider spacing might have a detrimental effect on reactance?