Hi All,
I'm working on a project where due to existing structures and services we are looking to use recycled plastic cable trough (https://www.hirdtts.com/products/green-trough/200-series/).
Has anyone managed to underpin the de-rating of running cables in this type of surface trough or cable duct, given this is not a standard installation method according to BSEN 60502-2?
Thanks,
Ben