We have a normal mains distribution unit and a separate off peak distribution unit controlled by an RTS switch unit each having a dumb meter. On the 16th September some one (from Calison) is being sent by our electricity supply company to enable our off-peak system to work after the RTS switch-off on the 17th September. Does anyone know how the independence from the RTS system is acheived?