What is the accepatble/understood method of testing an electrical panel where during test the building has a standard TN earthing system however when it gets to final destination it will be using an IT Earthing system?
For example testing the insulation monitors that are required on IT systems to indicate shorts to earth (on 3ph system) that would not trip protection devices or indeed testing that the protection devices do not trip on shorts to earth.
I have had suggested to use a 3ph isolating transformer, however I would suggest that addtional safety measures would be required for testing?
Thanks for any comments, much appreciated.