New build properties not installed to regs at the time of construction

I have come across many new builds where they would not meet the requirements at the time of installation.

We have brought this up with the developer / installer,they have mostly quoted best practise guide 4 saying that it's only a C3.

The way I read bpg4 is that it's for coding when the instalation was to a previous edition of the regulations.

What recourse is there in this situation?

Parents
  • If the houses were sold as "with wiring complying with the regs" I guess the original purchaser might have a legal claim against the builders (especially if there was a cert saying it complies when evidence can demonstrate otherwise - whoever's name is on the cert might be potentially gripping the bar as well).

    Yes, a legal matter, but in terms of 'compliant', which version of the standard?

    We have discussed this a number of times.

    Agreed ... but as this is not a forum for legal professionals, only those with the relevant expertise would be able to advise, and certainly not something that can be answered "in general"..

  • which version of the standard?

    the one written on the EIC after the "in accordance with BS 7671 ..." bit (unless of course the difference is mentioned in the departures section & justified). If the installation didn't comply (even with only C3s) the cert would be false.

       - Andy.

Reply
  • which version of the standard?

    the one written on the EIC after the "in accordance with BS 7671 ..." bit (unless of course the difference is mentioned in the departures section & justified). If the installation didn't comply (even with only C3s) the cert would be false.

       - Andy.

Children
No Data