Good afternoon. 

The IET code of practice for Grid connected Photovoltaic systems 2nd edition states: “The interval between periodic verifications may be specified by the client, by the installation company or linked to service contracts, warranty conditions or performance guarantees”.

Does anyone know of any further guidance on the inspection and testing intervals for the solar PV installation (AC and DC side).

Thanks in advance.