Earthing. Historical Requirements.

It is 1958 in England.


1. For what TWO reasons can an earth wire connecting an installation to a water main or water-pipe be made?


2. Who should be notified and approval given by, before an earth connection is made, in a manner approved, to a buried water main or water-pipe. (Clue: It is not the Queen).


Z.
Parents
  • 1. Presumably both Earthing and Bonding (supplementary) in today's language.

    2. Notice to the water authority would have been required, and the manner of connection must have been approved by the same. I wasn't aware of any necessity to wait for specific approval to be given make a connection however.


       - Andy.
Reply
  • 1. Presumably both Earthing and Bonding (supplementary) in today's language.

    2. Notice to the water authority would have been required, and the manner of connection must have been approved by the same. I wasn't aware of any necessity to wait for specific approval to be given make a connection however.


       - Andy.