This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

Earthing. Historical Requirements.

It is 1958 in England.


1. For what TWO reasons can an earth wire connecting an installation to a water main or water-pipe be made?


2. Who should be notified and approval given by, before an earth connection is made, in a manner approved, to a buried water main or water-pipe. (Clue: It is not the Queen).


Z.
Parents
  • Water authority is known as the water Undertaker, and possibly then as now approval would be deemed to be given if no reply is received within a period of time to a request.
Reply
  • Water authority is known as the water Undertaker, and possibly then as now approval would be deemed to be given if no reply is received within a period of time to a request.
Children
No Data