I can see load management as a way to make a 7.2kW charger viable for those of us still on 60A supplies. Otherwise I could be stuck with a 3.6kW charger when it comes to installing one.
I can see load management as a way to make a 7.2kW charger viable for those of us still on 60A supplies. Otherwise I could be stuck with a 3.6kW charger when it comes to installing one.