We should also perhaps be revisit the decision to shut the Rough offshore storage field, and how much it may cost to reduce the leaks that closed it back to an acceptable level.
Mike
Meanwhile for those wondering, page 17 of
ELECTRICITY SUPPLY EMERGENCY CODE has the rota power cut patterns that would be used
Blocks A to U and 3 hour timeslots, and 18 levels of disruption from losing just 3 widely spaced blocks of 3 hour per week (level 1) to off 24/7 at level 18.
Perhaps 3 hours is enough for a quick CU swap -)
We should also perhaps be revisit the decision to shut the Rough offshore storage field, and how much it may cost to reduce the leaks that closed it back to an acceptable level.
Mike
Meanwhile for those wondering, page 17 of
ELECTRICITY SUPPLY EMERGENCY CODE has the rota power cut patterns that would be used
Blocks A to U and 3 hour timeslots, and 18 levels of disruption from losing just 3 widely spaced blocks of 3 hour per week (level 1) to off 24/7 at level 18.
Perhaps 3 hours is enough for a quick CU swap -)