This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

The Swiss Way



We recently had our kitchen rebuilt and at the same time the distribution box was updated. Here are a few pictures to show a non UK installation. The supply is 3 phase 20A per phase. Lights and sockets are generally 1.5mm2  singles in conduit. Appliance power (2 or 3 phase) is usually cables in conduit. Sockets and lights are on the same circuit for a large room or a number of small rooms. Neutral used to be yellow and is now blue. Phases are red, white and black. Circuits after the switch can be any other colour.

64fe214e3a32373cfc13fd3fbe5acb1d-huge-01-bare-kitchen.jpg


Bare kitchen with first fix cabling

c8e58ae6697dc5cf980ca9d0337030aa-huge-02-ready-for-a-light-fitting.jpg


Ready for a light fitting

d27806d930806064e9394b54aefd6b84-huge-03-old-distribution-box-with-new-cables.jpg


The bottle fuses were for the appliances, 2 phase for the oven and hob and 3 phase for the dishwasher. The Bathroom and toilet had an RCD. The bedrooms and living room MCBs with neutral isolators.

3d5cf47b80207873e579b996534ead17-huge-04-swiss-plasterers-fill-the-boxes-as-well.jpg


Plasterers are the same everywhere.

82c35cdf1a47626fa161e9e19332df02-huge-06-space-for-the-oven-and-fridge-freezer.jpg


Space for the oven and fridge freezer with wiring.

2de8561beed4864fb2e2b66c36f58a9e-huge-07-wiring-for-the-hob-and-sockets.jpg


Wiring for the hob (cable) and sockets (singles).

1b1ec8c3f2fc3dcbf6d148774ced568d-huge-08-rebuilt-distribution-box.jpg


New distribution box. 3 phase MCBs for the oven and hob. RCDs for the dishwasher and lighting and power circuits.

33f52c124fa13fc9ed9db64aa66f203d-huge-09-documentation.jpg
592124a253ca1c378a7623a6ce6586c3-huge-10-supply-details.jpg


Supply details

8af10914d97f61cc680fa0e3ba8fef3d-huge-11-incoming-cable-to-the-block.jpg


Incoming cable to the block (6 apartments)

055ddf1b1dbbd9ab11b324ba7e0ad679-huge-12-meter-cupboard.jpg


Meter cupboard


.37d54f8a56d370a0ae7c78b8596399c4-huge-13-finished.jpg


Finished ?


Best regards


Roger

Parents
  • Ah, so the box with the 3 blade fuses is also, presumably, the place where the N-E bond and TNC-s split occurs. They obviously don't share our desire for lots of green and yellow singles to rush off from a MET at tht point to the water fuel pipes for the heating and so on. You had me looking up ceander, to find it is a trade name for wave concentric or 'wavecon'.

    Thankyou, it is interesting to compare styles, and to remind ourselves of how much of what we see as being set in stone as immovable truth is really our local habit.
Reply
  • Ah, so the box with the 3 blade fuses is also, presumably, the place where the N-E bond and TNC-s split occurs. They obviously don't share our desire for lots of green and yellow singles to rush off from a MET at tht point to the water fuel pipes for the heating and so on. You had me looking up ceander, to find it is a trade name for wave concentric or 'wavecon'.

    Thankyou, it is interesting to compare styles, and to remind ourselves of how much of what we see as being set in stone as immovable truth is really our local habit.
Children
No Data