This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

Cable specification for Fire/BMS installation on a large complex site

Hi all

Does any one have a steer on the above? Perhaps any one in the consulting side of things?


Colin  MIET
Parents
  • OMS

    Thanks for that. We are looking at the BS standard. Containment is the next issue as is BMS. At this stage it is a little backwards (reverse engineering!!)

    Thanks for your input.


    Colin
Reply
  • OMS

    Thanks for that. We are looking at the BS standard. Containment is the next issue as is BMS. At this stage it is a little backwards (reverse engineering!!)

    Thanks for your input.


    Colin
Children
No Data