Consumer Unit Change Video. Nice.

I liked this video because it is well filmed, has no loud music, and the sparks is very pleasant and explains things well. With plastic conduit I cheat and use manufactured elbows and bends sometimes because they save time and are very consistent and neat. What do you think?




Z.
Parents
  • Putting the SPD at the far end of the bus bar on the second RCD means that the circuits on the first RCD have effectively over a meter approx of cable path (L+N) between them and the SPD. It should really be put before the RCDs, next to the main switch.
Reply
  • Putting the SPD at the far end of the bus bar on the second RCD means that the circuits on the first RCD have effectively over a meter approx of cable path (L+N) between them and the SPD. It should really be put before the RCDs, next to the main switch.