Zs measurement on an Off Peak supply.

On an EIC for just metal board changes, one on "On Peak" and one on "Off Peak", what is the current thinking regarding entering Zs for the latter? - using an estimate of (R1 + R2) + Ze or just enter a Limitation, since this is an existing installation ?   


Jaymack
Parents

  • Blencathra:

    Sleeping bag and a flask required




    Is a measurement of Ze (or Zs) actually required by BS 7671?


     

Reply

  • Blencathra:

    Sleeping bag and a flask required




    Is a measurement of Ze (or Zs) actually required by BS 7671?


     