This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

TP&N board

Former Community Member
Former Community Member
Hi all, what's the best sequence when installing a new TP&N board. 

1) hang on wall and then build. 

2) build and hang on wall

3) none of the above

Hate doing things twice!

Will be installing steel trunking to bring cables into DB and tails from below using steel trunking and 32mm bushes. 


​​​​​​Regards Ts. 


​​​
Parents
  • 982573b04a90c93cdd480f5121a36a06-original-positek-l7-for-iet.jpg     

    This kind of thing. Its a replacement of existing DB, except there is a trunking kit across the top so you can accommodate all the different types of existing adhoc cables and cable management back in.


    56dadda5c533a1b639cb51f0ee9f08a8-original-positek-l6-iet-again.jpg  

    Another one, where you can see the slot in the top of the DB.
Reply
  • 982573b04a90c93cdd480f5121a36a06-original-positek-l7-for-iet.jpg     

    This kind of thing. Its a replacement of existing DB, except there is a trunking kit across the top so you can accommodate all the different types of existing adhoc cables and cable management back in.


    56dadda5c533a1b639cb51f0ee9f08a8-original-positek-l6-iet-again.jpg  

    Another one, where you can see the slot in the top of the DB.
Children
No Data