Cross sectional area of a protective conductors

Can someone give me a some advice on if we have a earth electrode system made up of the structural rebar when using the adiabatic equation to size of the bonding conductor comes out at 300mm. MY questions is does each bond need to be this size or can it be made up via a series of smaller bonds that are equal or exceed the 300mm requirement? My opinion is each bond needs to be this size to deal with the fault current as the direction it will flow is unknown. What are peoples thoughts? I cannot see anything in the regs on this.

Parents
  • OMS, and Mapj1, where do you learn such in-depth stuff?

    I've havent ever worked on HV, or LV transformers, I have done a few connections to the LV side of the DNO transformer, always supervised by a DNO guy.

    It would be nice to learn more about this side of engineering.

    Thanks.
Reply
  • OMS, and Mapj1, where do you learn such in-depth stuff?

    I've havent ever worked on HV, or LV transformers, I have done a few connections to the LV side of the DNO transformer, always supervised by a DNO guy.

    It would be nice to learn more about this side of engineering.

    Thanks.