Chris Pearson:
That drawing could almost be my house, but there seem to be no gas pipes; and why is that baguette above the wash hand basin not bonded?
There is not a diagram in the IET Onsite Guide showing the requirements for supplementary bonding in bathrooms anymore, but that doesn’t mean it not required does it?
The light is not bonded either is it? Unlike the “baguette” electric fire the light didn’t actually require a CPC earth wire until a few years beforehand, so there was probably still an assumption it was all insulated.
Andy B.
Chris Pearson:
That drawing could almost be my house, but there seem to be no gas pipes; and why is that baguette above the wash hand basin not bonded?
There is not a diagram in the IET Onsite Guide showing the requirements for supplementary bonding in bathrooms anymore, but that doesn’t mean it not required does it?
The light is not bonded either is it? Unlike the “baguette” electric fire the light didn’t actually require a CPC earth wire until a few years beforehand, so there was probably still an assumption it was all insulated.