Weirdbeard:
Hi Tom, do you have a ball park figure in mind of what you might consider spending for materials and time on this project?
I would think that setting it all up would / could be completed in a day or so???
The switch gear, (manual), seems very simple and I'm sure I can sort / iron out any problems.
I have to be honest, here... you see I was thinking about buying a 3' x 3' bit of ply... fixing some 3" x 3" metal trunking, a third of the way up... fix a fused switch, fix a contactor plus a switched spur to energize the contactor... fix some other bits like a timer etc BUT... I can now simply fix a switch!! Haha!
Costs??? The switchover would be around £100??? A generator would be about... £1k?? Miscellaneous ~ £200???
I just feel that 2021 etc... could be a difficult period in these VERY uncertain times! I just want to make sure I'm covering my bottom!!
Good luck ~ Tom
Weirdbeard:
Hi Tom, do you have a ball park figure in mind of what you might consider spending for materials and time on this project?
I would think that setting it all up would / could be completed in a day or so???
The switch gear, (manual), seems very simple and I'm sure I can sort / iron out any problems.
I have to be honest, here... you see I was thinking about buying a 3' x 3' bit of ply... fixing some 3" x 3" metal trunking, a third of the way up... fix a fused switch, fix a contactor plus a switched spur to energize the contactor... fix some other bits like a timer etc BUT... I can now simply fix a switch!! Haha!
Costs??? The switchover would be around £100??? A generator would be about... £1k?? Miscellaneous ~ £200???
I just feel that 2021 etc... could be a difficult period in these VERY uncertain times! I just want to make sure I'm covering my bottom!!
Good luck ~ Tom