Zoomup:
In EPN, only riser and lateral systems that are of an adoptable standard, or would have been at the time of construction, and installed post 1972 and before 1st June 2013. Indications of pre-1972 properties will include the existence of metal-clad cut-outs or VIR cables.
If those frightful cables are between the first service head and the meter, could the supplier be responsible?
Might the leases say something about rights and responsibilities?
Zoomup:
In EPN, only riser and lateral systems that are of an adoptable standard, or would have been at the time of construction, and installed post 1972 and before 1st June 2013. Indications of pre-1972 properties will include the existence of metal-clad cut-outs or VIR cables.
If those frightful cables are between the first service head and the meter, could the supplier be responsible?
Might the leases say something about rights and responsibilities?