This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

DNO notification

I diligently completed 12 separate forms and notified my DNO a of the 12 EVSE installations we had completed last month.  A multi-notification document was also available but for my own records, the individual forms are best. Any way, got an email back rejecting them as a new form had been introduced. It has no less than 70 pieces of information to be inserted. I thought we were making a bonfire of red tape!

Parents
  • And have you heard the latest about EV Training? C&G are doing away with the 2919, and doing 3 different modules, C&G 2921 1,2 and 3.

    And there will be no practical work on any. 1 is the 2919 replacement, 2 and 3 are design and installation of larger EVs/charging stations.

    More easy cash for the Colleges/C&G?

  • Alan, I had a quick review of the new qualification set-up. Interesting concept. Particularly, the requirements for enrolling. I do see the point but applied rigorously, I wouldn’t be able to enrol as I don’t have a NVQL3, although I can still deliver the course. 
    Not sure about the easy cash bit. Our centre has an excellent reputation across the board and works hard to maintain it.

  • I do see the point but applied rigorously, I wouldn’t be able to enrol as I don’t have a NVQL3

    Whatever happened to 'system accredited learning' ?

Reply
  • I do see the point but applied rigorously, I wouldn’t be able to enrol as I don’t have a NVQL3

    Whatever happened to 'system accredited learning' ?

Children
No Data