I will be installing the following circuit to supply an LV Distribution Panel:
8 x 240mm AWA single core conductors (2 cables per phase + neutrals connected in parallel)
To be installed on ladder in trefoil formation for a distance of 40m, then ducted for 20m in 2 x trefoil sets of 100mm single-way ducts and 1 x 150mm duct (for neutrals) installed in the following formation as per GN6.
Is this correct formation, with regard to the phase sequence, or should the conductors be run in phased groups.