I'm not sure that insisting on bringing a CPC to places where one is not required is always the best approach. I guess this can be used to verify RCD operation by introducing a fault to order whenever the light is switched on, or maybe the other end is not earth at all but is some cunning way of feeding power in a daisy chain to another location.
by a very small margin, I'd prefer to see that CPC cut back.
(really it should end neatly in a choc bloc single, or a wago or go under the head of one of the back box mounting screws. Flapping free sleeved but folded to a hairpin so the sleeving stays on also works if done well.)
M.
I've seen the c.p.c. reused as a live before- usually where someone tried to convert to 2-way switching but didn't want to disrupt the decor by changing to a triple and earth. I wonder if the switch was a 2-way one in a previous stage of the installation's life and then converted back.
- Andy,
We're about to take you to the IET registration website. Don't worry though, you'll be sent straight back to the community after completing the registration.
Continue to the IET registration site