This discussion is locked.
You cannot post a reply to this discussion. If you have a question start a new discussion

Light Switch.

  • I'm not sure that insisting on bringing a CPC to places where one is not required is always the best approach. I guess this can be used to verify RCD operation by introducing a fault to order whenever  the light is switched on, or maybe the other end is not earth at all but is some cunning way of feeding power in a daisy chain to another location.

    by a very small margin, I'd  prefer to see that CPC cut back.

    (really it should end neatly in a choc bloc single, or a wago or go under the head of one of the back box  mounting screws. Flapping free  sleeved but folded to a hairpin so the sleeving stays on also works if done well.)

    M.

  • I favour 3 core cable with the grey sleeved with the g/y sleeving to give anyone looking to think about it.

    That's my story and I'm sticking to it!

  • Ooh Norman lad, complicating it even more for the hard of thinking, is that a good idea or are you imagining it might kickstart them to actually think? Wink

  • I've seen the c.p.c. reused as a live before- usually where someone tried to convert to 2-way switching but didn't want to disrupt the decor by changing to a triple and earth. I wonder if the switch was a 2-way one in a previous stage of the installation's life and then converted back.

       - Andy,

  • Either - it is single red and earth, Or, the black has broken somewhere and the cpc has been utilized as a replacement!