BS7671:2018:Amendment 2:2022 Electrical Installation Certificate Schedule of Inspections.

In the new edition of BS7671 the Electrical Installation Certificate Schedule of Inspections covers four pages from page 515 to page 518, on the certificates I use it gets condensed to two pages of tick boxes.

Every time I do a EIC or EICR it feels like I am doing a multiple choice exam and sometimes I have to do several in a day.

I have had a look at the downloadable IET certificates, I nearly missed the EIC Schedule of Inspections it is so brief, is this all that is actually required?

electrical.theiet.org/.../bs7671-eic.pdf

Parents
  • I see what you mean, but there is also the checklist on p. 515. It would seem wise to keep a copy even if it is not given to the customer.

Reply
  • I see what you mean, but there is also the checklist on p. 515. It would seem wise to keep a copy even if it is not given to the customer.