BS7671:2018:Amendment 2:2022 Electrical Installation Certificate Schedule of Inspections.

In the new edition of BS7671 the Electrical Installation Certificate Schedule of Inspections covers four pages from page 515 to page 518, on the certificates I use it gets condensed to two pages of tick boxes.

Every time I do a EIC or EICR it feels like I am doing a multiple choice exam and sometimes I have to do several in a day.

I have had a look at the downloadable IET certificates, I nearly missed the EIC Schedule of Inspections it is so brief, is this all that is actually required?

electrical.theiet.org/.../bs7671-eic.pdf

Parents
  • The latest domestic EICR Schedule of Inspections in the Trimble NAPIT Fast Test certification, plenty of boxes to check.

    I don’t know why, I ended up with two versions of the same report yesterday, an Amendment 1 version and a Amendment 2 version presented in different formats, but with all the same entries I made.

    I emailed and posted the Amd 1 version to the customer yesterday, now I have found the Amd 2 version in the folder on my desktop, so I am sending that as well.

    There is something on there that I may start a different discussion about, to try and keep things relevant, spot the new entry. 

Reply
  • The latest domestic EICR Schedule of Inspections in the Trimble NAPIT Fast Test certification, plenty of boxes to check.

    I don’t know why, I ended up with two versions of the same report yesterday, an Amendment 1 version and a Amendment 2 version presented in different formats, but with all the same entries I made.

    I emailed and posted the Amd 1 version to the customer yesterday, now I have found the Amd 2 version in the folder on my desktop, so I am sending that as well.

    There is something on there that I may start a different discussion about, to try and keep things relevant, spot the new entry. 