Regulation 71.415.2.3 states that
‘Connections shall be so arranged that they are accessible, clearly labelled and can be clearly disconnected’
Does this requirement relate to just the outgoing bonding connections serving the Group 1 medical equipment location, or does it also refer to the connection between the EBB and the system earthing?